Model Supply Chain Flexsim Software Study A Rea
Model Supply Chain Flexsim Software Study A Rea
Need to use flexsim software and refer to my initial proposal and question in the picture or in words file.
I attached the powerpoint sample for you.
Company is NTUC fairprice supermarket : https://www.fairprice.com.sg/webapp/wcs/stores/ser…
to use the concepts of Korea virtual supermarket at train station platform while passenger waiting for train.
Project: 1 Objective To enhance students understanding of
the concepts and principles of system modelling and simulation through:
§ Study a real life
operating system and map its process flow.
§
Understand the system resource requirement, schedules, capacity, and locations.
§ Identify process activity
locations and their routing.
§
Collection and analysis of data on inter-arrival times for flow items, process
times, downtimes, maintenance times, rework times or any activity times
whenever applicable. §
Construction of system model on Flexsim, verification and validation.
§ Adding necessary and
appropriate animation for visual enhancement, tracking entity flow and
statistical information.
§
Optimise current model to improve it performance through resource relocation,
rescheduling and entity/process routing.
2 Instruction. · You are required to identify a
suitable system, either from service or manufacturing sector, with reasonable
complexity to model and simulate. ·
You are required to submit the powerpoint presentation slides and present the
project in week 18. Late submission of project will be penalized.
Important note: Any project initiated must have at least an
objective to improve the existing process (e.g. optimize resource utilization,
minimize waiting/queuing time, reduction of cycle time, cost saving, service
level improvement, etc.). Able to model an existing system or a process is not
your primary objective. Property of TP, Copyright © Page 2 of 2 Suggested
Systems to Model §
Supply chain management. §
Banking or finance system (or sub system) of a small branch of a major
establishment. §
Restaurant or café services. §
Entertainment outlets (game arcades, theme parks, cinemas.etc.) § 4D/Toto outlets. (these
are less challenging) §
Any of the food stores in any of the TP canteens. Assuming there are only ten
4- seater tables and ten 2-seater tables are available. § Any manufacturing process, e.g.
food, textile, hardware, software, you can access to. § ………..
Need to use flexsim software and refer to my initial proposal and question in the picture or in words file.I attached the powerpoint sample for you. Company is NTUC fairprice