High Technologycentralized Locationlow Technologyd

High Technologycentralized Locationlow Technologyd

1000-1500 Words

APA Format – At least 3 References with in text citations

Scenario: Smitheford Pharmaceuticals is facing other issues. The company had not kept up with modern manufacturing technology and was in the process of modernizing the injectable manufacturing facilities in Pueblo and Colorado Springs. There were several modernizing scenarios under analysis. Perform cost-benefit analysis calculations for 2 equipment scenarios. The data are provided below.

Scheduling the various manufacturing operations has become more complicated. In the 1990s, the Pueblo plant expanded tremendously, based on forecasts for the growth of a promising osteoporosis medication, Osto54. The facility doubled in size, mostly with tanks and processing equipment. Osto54, however, caused heightened enzyme levels in the liver and led to seven deaths in the elderly because of drug interactions. Smitheford faced the loss of millions of dollars in liability suits and had excess intermediate manufacturing capacity in Pueblo.

Two years ago, a new immune system treatment, Ultamyacin, was discovered by a Smitheford researcher. The drug could be manufactured at the Pueblo facility for the bulk manufacturing, but the final manufacturing steps could be made in Puerto Rico for final purification and then sent to Fort Collins for final manufacturing into sterile bottles for injection.

Smitheford leadership has narrowed the decision making down to 2 options. The first is a higher technology option in one location, and the other is a lower technology option in several locations.

High Technology
Centralized Location
Low Technology
Decentralized
Annual Fixed Cost $620,000 $110,000
Variable Cost/Product 16.31 18.89
Estimated Annual Production
(in number of products) Year 1 100,000 100,000
Year 5 170,000 170,000
Year 10 225,000 225,000

Use applicable business formulas to determine costs for both options.

Consider the following questions:

  • Which is the lead cost alternative in Years 1, 5, and 10?
  • How much would the variable cost per unit have to be in Year 5 for the automated alternative to justify the additional annual fixed cost of the automated alternative over the manual alternative?
  • Determine what other factors should be considered when deciding the following:
    • When to centralize manufacturing
    • When to opt for higher technology optionsv

1000-1500 WordsAPA Format – At least 3 References with in text citationsScenario: Smitheford Pharmaceuticals is facing other issues. The company had not kept up with modern manufacturing technology and was

Calculate your order
Pages (275 words)
Standard price: $0.00
Client Reviews
4.9
Sitejabber
4.6
Trustpilot
4.8
Our Guarantees
100% Confidentiality
Information about customers is confidential and never disclosed to third parties.
Original Writing
We complete all papers from scratch. You can get a plagiarism report.
Timely Delivery
No missed deadlines – 97% of assignments are completed in time.
Money Back
If you're confident that a writer didn't follow your order details, ask for a refund.

Calculate the price of your order

You will get a personal manager and a discount.
We'll send you the first draft for approval by at
Total price:
$0.00
Power up Your Academic Success with the
Team of Professionals. We’ve Got Your Back.
Power up Your Study Success with Experts We’ve Got Your Back.

Order your essay today and save 7% with the discount code ESSAYHELP7